    RO EDI and Piping Chicago, IL.

    Reverse Osmosis Water Treatment Plant, EDI and Stainless Steel Process Piping
    Scope includes design-build services, construction management and general contracting.

    • Budget - $5.4M
    • Project Duration – 4 weeks
    • Direct coordination with G.E. Manufacturing and Install

    Project Team:
    Catalyst GC
    Architect- Studio 3
    Design Build MEP’s
    some more text about project

    Prev Next
    x Close
  • image02 CATALYST
    image02

    Teleflex MedicalChicago, IL.

    Reverse osmosis water treatment plant
    Scope includes design-build consulting, construction management and general contracting.

    • Budget – $1.5M
    • Project Duration – 2 weeks
    • Direct coordination with G.E. Manufacturing and Install

    Project Team:
    Developer Services/General Contractor: CATALYST
    Architect: Studio 3

    Prev Next
    x Close
  • image03 catalyst
    image03

    Teleflex MedicalChicago, IL.

    Reverse osmosis water treatment plant
    Scope includes design-build consulting, construction management and general contracting.

    • Budget – $1.5M
    • Project Duration – 2 weeks
    • Direct coordination with G.E. Manufacturing and Install

    Project Team:
    Developer Services/General Contractor: CATALYST
    Architect: Studio 3

    Prev Next
    x Close
  • image01 CATALYST
    image01

    Hudson RCI Arlington Heights, IL

    20,000 square foot clean room project

    Scope includes design build consulting, construction management and general contracting

    • Budget: $3.2M
    • Project Duration: 18 months phased occupied build out. Clean room remained in production during the entire construction project.
    • Direct over site of the entire project from conception to completion.

    Project Team:
    General Contractor: CATALYST Architect: Studio 3
    MEP’s: Design Build Mechanical Team

    Prev Next
    x Close
  • image05 CATALYST
    image05

    Tilt Up Pre-cast Distributon CenterChicago, IL.

    Scope includes design-build services, construction management and general contracting
    • Design and engineered 30,000 light industrial office park and building
    • Provided full owner office build out of 10,000 SF
    • Provided 5,000 SF of high bay racking
    • Provided future tenant spaces of 15,000 SF

    Project Team:
    KLM Architects
    Catalyst GC
    MEP Design Build

    Prev Next